與倉庫合併相關的注意事項

與倉庫合併相關的注意事項:
1. 原材料應標明檢驗狀態, 物料編號, 生產日期, 且不應超過材料的有效儲存量.
術語; 無日期嘅材料, 重新增加年份, 月, 同貼紙上嘅日;
2, 儲存條件應保持喺28°C以下, 濕度 40 ~ 80%; 空調審核厂當天開業;
3. 所有原材料供應商必須係合格供應商目錄中嘅供應商;
4. 合格供應商目錄中嘅製造商必須獲得認證並有相關記錄;
5, 來料待檢不能放不良品; 檢查後, 必須有明確嘅身份證明 (合格, 拒絕, 等。);
6. The material placed on each iron shelf shall be identified with the name of the material hanging above the shelf;
Some shelves do not have a hanging logo, it is best to reprint the suspension all;
7. The materials and finished products are placed neatly, and all materials and finished products cannot be placed directly on the floor and placed on the paper.
Above the skin or pallet;
8. The quantity of incoming and outgoing, balance and actual quantity on the material card
9. The control of the material “first in, first out” is placed according to the method discussed on the afternoon of Saturday;
10. The material validity period refers to thematerial storage expiration date – – watch list”, this form has been posted on the warehouse interior wall
Above the wall; if the value exceeds the effective value, therecheckmark is attached, so the material exceeding the effective value is collected.
Do not put it on the shelf;
11. Do not place anything unrelated to defective products in the return area next to the warehouse door;
12. All materials that are inconvenient to handle or unmarked are placed on a shelf and the label is “to be processed”;
13, the packaging of hardware, if not the whole bag, the mantissa needs to be sealed with tape;
14. If there is no environmental protection RoHS mark on the packaging, paste the green RoHS sticker;


發佈時間: 2019-11-06
即刻查詢