Viraussetzungen am Zesummenhang mat Warehouse Konsolidéierung

Viraussetzungen am Zesummenhang mat Warehouse Konsolidéierung:
1. Rawmaterialien solle mat Inspektiounsstatus markéiert ginn, Material Zuel, proballt Dateau, a soll net déi effektiv Späichere vu Materialien iwwerschreiden.
Frefeglecht; Materialien ouni Datum, d'Joer nei erhéijen, Mount, an Dag um Sticker;
2, Späicherbedéngungen sollten ënner 28c gehalen ginn, fiichtegkeet 40 ~ 80%; Klimaanlag Audit Fabréck fir de selwechten Dag opzemaachen;
3. All Fournisseuren vu Rawmaterialien musse Liwweranten am qualifizéierten Liwwerantverzeechnes sinn;
4. D'Hiersteller am qualifizéierten Zouliwwerer Katalog muss agespaart ginn an sinn relevant records;
5, déi erënnere Materialien fir ze inspizéieren kann net defekt Produkter setzen; an no der Inspektioun, there must be clear identification (qualified, rejected, etc.);
6. The material placed on each iron shelf shall be identified with the name of the material hanging above the shelf;
Some shelves do not have a hanging logo, it is best to reprint the suspension all;
7. The materials and finished products are placed neatly, and all materials and finished products cannot be placed directly on the floor and placed on the paper.
Above the skin or pallet;
8. The quantity of incoming and outgoing, balance and actual quantity on the material card
9. The control of the material “first in, first out” is placed according to the method discussed on the afternoon of Saturday;
10. The material validity period refers to thematerial storage expiration date – – watch list”, this form has been posted on the warehouse interior wall
Above the wall; if the value exceeds the effective value, therecheckmark is attached, so the material exceeding the effective value is collected.
Do not put it on the shelf;
11. Do not place anything unrelated to defective products in the return area next to the warehouse door;
12. All materials that are inconvenient to handle or unmarked are placed on a shelf and the label is “to be processed”;
13, the packaging of hardware, if not the whole bag, the mantissa needs to be sealed with tape;
14. If there is no environmental protection RoHS mark on the packaging, paste the green RoHS sticker;


Post Zäit: 2019-11-06
Ufro elo