Qedexeyên Qedexe

Terîf:

Hot Dip Galvanizationlarge storage boxes grey storage boxes cheap storage boxes white storage boxes

All Elec containers are fully hot dip galvanized after assembly, to ensure a corrosion resistant coating, according to the ISO 1461.

EN 840 Compliancestacking storage boxes storage trays heavy duty storage boxes

All 1100 containers are fully produced under the EN840 compliant, to ensure the waste bin is compatible with customers requirements, such as trunnion and comb bar lifting devices.

Laser Cuttingcanvas storage cubes storage buckets collapsible storage box

All 1100 litre Elec waste and recycling bins are using laser cutting, to ensure each smooth edge of steel sheet, to fit together tightly.

Good Quality Casterssquare storage boxes grey storage baskets stackable storage containers

All Elec compost bins are fully assembled with good quality casters, which are as same quality as famous European factories, to ensure easy roasting and mobility square storage bins.

Kîtekîteya Hilbera

Tags Product

Hûrguliyên zû

Şanî: YG-B07
Mal: Mild Q235 Steel
Mezinayî xwazî ​​kirin
Dermankirina erdê: powder coating /hot dip galvanized
Available design Top lid/forklift guide
Available accessories Wheels/bag
Application area Warehouse, logistic, recycling industry, PET preform or waste,
Kapasîteya barkirinê 1000-2000kg
Stackting 1+3 pel
Bingotin Customized or OEM support

Bikaranînî :

Kontrola pêvajoyê û kalîteyê:

Feydeya me:

Ser 10 salan di vê qadê de.

Tecrûbir r&D Tîm Piştgiriya Pîşeyî Li gorî karanîna we piştgirî dike.

Rasterast bi bihayê fabrîkî bi kalîteya bilind.

Bi gelek salan bi pargîdaniya navdar re hevkariyê bikin.

ISO9001 derbas kir:2008 Pergala kalîteyê ,SGS,CE

Namûs:

Miştirî

FAQ:

Q: Where is your factory located? How can I visit there?
YEK: Our factory is located in FoshanCity, Guangdong Province, China, close to Guangzhou You can fly to Guangzhou airport directly. You are warmly welcome to visit us whenever you are available!

 

Q: What is the raw material of your products?
YEK: As general, the raw material of steel code is Q235. Other steel is also available to clientsrequirements.

 

Q: What is the term of payment?
YEK: As general, 35% T/T down payment and balance before shipping.

 

Q: What is delivery time?
YEK: It depends on the order quantity and product types. As general, within 20 working days, for ordinary order quantity..

 

Q: Kîjan port dê wekî porta barkirinê were bikar anîn?
YEK: Guangzhou nansha port

 

Q:Is customized available?
Yes, almost all the product can be customized.

 

Q: Can you design and make drawing for us ?
Yes, we make best suitable design and drawing according your usage detail and request for your confirm before order.

 

Q: Feydeya we çi ye?
YEK: 1. Libersekînîn: —3~ 10 sal in ku di rewşê de garantî ye
Di dema operasyonê de destwerdana rast, Dema ku Stacking / Un-Stacking, Rastkirina Forklift
B Overloading B qedexe ye
C Daxwaza Jîngehê -indoor, rewşên hişk û ne şerm, Bi her materyalê kîmyewî ya kîmyewî re têkilî nekin (ji bo hilberên zincî û pîvazên pîvaz ên pîvandî, Ji bo germa germê ya germê tixûbdar tune).
2. Buhayê kargehê: Buhayê Pêşbaziya Firotanê ya Factory.
3. Em berpirsiyariya tevahî ji bo kêmasiya çêkirinê digirin, dê ji we re hilberên baş an ji nû ve vegere

Karxane:

Pêşangeha Pêşangehê:

 

Peyama xwe ji me re bişînin:

Lêpirsîn naha
Lêpirsîn naha