Precautions related to warehouse consolidation:
1. Raw materials should be marked with inspection status, material number, production date, and should not exceed the effective storage of materials.
Term; materials without date, re-increase the year, month, and day on the sticker;
2, Kahanan panyimpenan kudu disimpen ing ngisor 28C, Kelembapan 40 ~ 80%; pabrik audit udud kanggo mbukak dina sing padha;
3. Kabeh supplier Bahan mentah kudu dadi supplier ing direktori supplier sing cocog;
4. Produsen ing katalog supplifies sing kudu diakoni lan duwe cathetan sing relevan;
5, bahan mlebu sing bakal diteliti ora bisa nyelehake produk cacat; lan sawise pemeriksaan, Mesthi ana identifikasi sing jelas (mumpuni, ditolak, lsp.);
6. The material placed on each iron shelf shall be identified with the name of the material hanging above the shelf;
Some shelves do not have a hanging logo, it is best to reprint the suspension all;
7. The materials and finished products are placed neatly, and all materials and finished products cannot be placed directly on the floor and placed on the paper.
Above the skin or pallet;
8. The quantity of incoming and outgoing, balance and actual quantity on the material card –
9. The control of the material “first in, first out” is placed according to the method discussed on the afternoon of Saturday;
10. The material validity period refers to the “material storage expiration date – – watch list”, this form has been posted on the warehouse interior wall
Above the wall; if the value exceeds the effective value, the “recheck” mark is attached, so the material exceeding the effective value is collected.
Do not put it on the shelf;
11. Do not place anything unrelated to defective products in the return area next to the warehouse door;
12. All materials that are inconvenient to handle or unmarked are placed on a shelf and the label is “to be processed”;
13, the packaging of hardware, if not the whole bag, the mantissa needs to be sealed with tape;
14. If there is no environmental protection RoHS mark on the packaging, paste the green RoHS sticker;
Wektu kirim: 2019-11-06