Warehouse Kev lag luam Collapsible Stacking Steel Pallet Khib

Kev piav txog:

1. Empty shelf racksteel rackcan be inserted into each other (fixed) or disassembled (detachable) to save space;

2. The stack rack steel shelvingcan effectively protect the goods from damage during transportation. The safety of goods is guaranteed;

3. Quantitative storage, metal shelving unit, distribution of goods can be carried out in a planned manner. Storage and transportation are convenient and fast;

4. metal rack can be used in a high stack to improve space utilization. storage rackscan stack up to 4 layers and has a bearing capacity of 3000kg.shelving systemsheavy duty shelving is convenient and reliable.warehouse racking can be folded to save space when not in use.

5. A wide range of applications, which combined with mechanized handling equipment, can be used in transportation, handling, storage, and other aspects.

Khoom Qhia Qhia

Khoom Ntawv

Cov Lus Qhia Ceev

Item: YG-R03
Material: Mild Q235 steel
Size customized
Surface treatment: powder coating /galvanized
Available design Detachable / folding
Available accessories Wheels
Application area Warehouse, logistic, recycling industry,storage,auto
Loading capacity 1000-2000kg
Stacking 1+3 layer
Remark Customized or OEM support

Daim ntawv thov:

Ua thiab Tswjhwm Zoo:

Peb Qhov Kom Zoo:

Saum 10 xyoo kev nyob rau hauv daim teb no.

Kev paub r&D Pab Tiv Thaiv Pab Txhawb kev ua haujlwm raws li koj siv.

Ncaj qha Hoobkas nqe nrog cov khoom lag luam zoo.

Kev koom tes nrog cov lag luam nto moo ntau xyoo.

Dhau ntawm ISO9001:2008 Txheej Txheem Zoo ,Sgs,Piam

Kev hwm:

Tus yuav

Cov FAQ:

Q: Where is your factory located? How can I visit there?
Ib: Our factory is located in FoshanCity, Guangdong Province, China, close to Guangzhou You can fly to Guangzhou airport directly. You are warmly welcome to visit us whenever you are available!

 

Q: What is the raw material of your products?
Ib: As general, the raw material of steel code is Q235. Other steel is also available to clientsrequirements.

 

Q: What is the term of payment?
Ib: As general, 35% T/T down payment and balance before shipping.

 

Q: What is delivery time?
Ib: It depends on the order quantity and product types. As general, within 20 working days, for ordinary order quantity..

 

Q: Which port will be used as loading port?
Ib: Guangzhou nansha port

 

Q: Is customized available?
Yes, almost all the product can be customized.

 

Q: Can you design and make drawing for us ?
Yes, we make best suitable design and drawing according your usage detail and request for your confirm before order.

 

Q: Koj tau txais txiaj ntsig zoo?
Ib: 1. Kev lav: —3~ 10 xyoo lav tias nyob rau hauv rooj plaub uas
Kev ua haujlwm kom raug thaum ua haujlwm, Kho kom raug forklift tuav thaum sib nkas / un-stacking
B overloading yog txwv
C Ib puag ncig thov -indoor, qhuav thiab tsis muaj xwm txheej av, Tsis txhob sib chwv nrog cov khoom siv tshuaj lom neeg (Rau Zinc Plated thiab Hmoov Coated Khoom, Tsis muaj kev txwv rau kub dip galvanized).
2. Hoobkas Nqe: Lub Hoobkas Kev Muag Khoom Ncaj Nrees Sib Tw.
3. Peb ris tag nrho lub luag haujlwm rau ib qho kev tsim khoom, yuav rov qab los yog reshmh txhij cov khoom lag luam zoo rau koj

Tsev tsim khoom:

Qhia Qhia Ua Yeeb Yam:

Xa koj cov lus rau peb:

Nug tam sim no
Nug tam sim no