Deatachable warehouse storage steel rack

Тасвирламасы:

Deatachable warehouse storage steel rack shelves metal shelving, which are designed for warehouse storage exclusively. Metal rack steel rack can be stacked up to 4 layers and the loading capacity is up to 3000kg. The steel stacking shelves can effectively protect the goods from damage during transportation. This is a heavy duty, durable and long lasting racking and storage solutions.

The metal stacking racks can stack heavy objects and store them in multiple layers. It can be arranged at will and easy to move. Save space by using a stacked storage design. In terms of load-bearing, the load on the two rails can be equally distributed to four columns. The greater the load, the more stable it is. It can play an outstanding role in shaking such as earthquakes. The stacking racks warehouse is all processed by welding and is almost permanent in terms of durability

Нәрсә, Продукт

Теглар Товарның

Тиз Детальләре

Item: YG-R01
Material: Mild Q235 steel
Size customized
Surface treatment: powder coating /galvanized
Available design Detachable / folding
Available accessories Wheels
Application area Warehouse, logistic, recycling industry,storage,auto
Loading capacity 1000-2000kg
Stacking 1+3 layer
Remark Customized or OEM support

Application:

Processing and Quality control:

OUR ADVANTAGE:

Over 10 years experience in this field.

Experienced R&D team support professional drawing according your usage.

Directly factory price with high quality.

Cooperate with famous enterprise many years.

Passed the ISO9001:2008 quality system ,SGS,CE

Honor:

Customer

FAQ

Q: Where is your factory located? How can I visit there?
A: Our factory is located in FoshanCity, Guangdong Province, China, close to Guangzhou You can fly to Guangzhou airport directly. You are warmly welcome to visit us whenever you are available!

 

Q: What is the raw material of your products?
A: As general, the raw material of steel code is Q235. Other steel is also available to clientsrequirements.

 

Q: What is the term of payment?
A: As general, 35% T/T down payment and balance before shipping.

 

Q: What is delivery time?
A: It depends on the order quantity and product types. As general, within 20 working days, for ordinary order quantity.

 

Q: Which port will be used as loading port?
A: Guangzhou nansha port.

 

Q:Is customized available?
Yes, almost all the product can be customized.

 

Q: Can you design and make drawing for us ?
Yes, we make best suitable design and drawing according your usage detail and request for your confirm before order.

 

Q: Нәрсәдә сезнең кулда?
A: 1. Гарантиясе: —3~10 ел гарантированности очракта, әгәр булса,
A Proper handling during operation, correctly forklift handling while stacking/un-stacking
B Overloading is prohibited
C Environment request –indoor, dry and not humid circumstance, do not contact with any corrosive chemical material (for zinc plated and powder coated products, no limitation for hot dip galvanized).
2. Factory price: Factory direct sale competitive price.
3.We take full responsibility for any manufacturing defect, would either refund or reship good products to you

Factory:

Exhibition show:

Send your message to us:

INQUIRY NOW
INQUIRY NOW